{"id":2419,"date":"2025-07-01T05:41:09","date_gmt":"2025-07-01T05:41:09","guid":{"rendered":"https:\/\/invest.chisinau.md\/?p=2419"},"modified":"2025-07-01T05:41:09","modified_gmt":"2025-07-01T05:41:09","slug":"desfasurarea-lucrarilor-in-faza-a-doua-a-proiectului-deseuri-solide-chisinau","status":"publish","type":"post","link":"https:\/\/invest.chisinau.md\/en\/desfasurarea-lucrarilor-in-faza-a-doua-a-proiectului-deseuri-solide-chisinau\/","title":{"rendered":"Progress of works in the second phase of the \u201cChisinau Solid Waste\u201d project"},"content":{"rendered":"<p><\/p>\n<p data-start=\"2550\" data-end=\"2731\">Chisinau City Hall and the municipal sanitation operator &#8220;Autosalubritate&#8221; announce that the second phase of the \u201cChisinau Solid Waste\u201d project is progressing according to schedule.<\/p>\n<p data-start=\"2733\" data-end=\"2753\">This phase includes:<\/p>\n<ul>\n<li data-start=\"2755\" data-end=\"2873\">Recultivation of the temporary landfill in the Ciocana sector (used for waste disposal between 2010 and 2017 \u2013 Lot I);<\/li>\n<li data-start=\"2875\" data-end=\"2959\">Construction of a new transfer station equipped with a modern sorting line (Lot II).<\/li>\n<\/ul>\n<p data-start=\"2961\" data-end=\"3136\">This is the largest investment project in waste management infrastructure ever implemented in the Republic of Moldova, with a major impact on the quality of services provided.<\/p>\n<p data-start=\"3138\" data-end=\"3278\">At Lot I, landfill conservation works are underway: re-profiling, compacting, road construction, and technical studies for biogas potential.<\/p>\n<p data-start=\"3280\" data-end=\"3374\">Meanwhile, at Lot II, stripping of the topsoil has been completed, and earthworks are ongoing.<\/p>\n<p data-start=\"3376\" data-end=\"3567\">The investment in this phase exceeds 12 million euros, out of a total project budget of around 26 million euros. The project is funded by Chisinau City Hall, EBRD, EIB (MF), and the E5P Fund.<\/p>\n<p data-start=\"3569\" data-end=\"3615\">Project completion is scheduled for July 2026.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Chisinau City Hall and the municipal sanitation operator &#8220;Autosalubritate&#8221; announce that the second phase of the \u201cChisinau Solid Waste\u201d project is progressing according to schedule. This phase includes: Recultivation of the temporary landfill in the Ciocana sector (used for waste disposal between 2010 and 2017 \u2013 Lot I); Construction of a new transfer station equipped [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2420,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,31,33,1,6],"tags":[],"class_list":["post-2419","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proiecte-sustinute-de-parteneri-de-dezvoltare","category-rezultate","category-rezultate-incaperi-nelocuibile","category-noutati","category-istorii-de-succes"],"acf":[],"_links":{"self":[{"href":"https:\/\/invest.chisinau.md\/en\/wp-json\/wp\/v2\/posts\/2419","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invest.chisinau.md\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invest.chisinau.md\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invest.chisinau.md\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/invest.chisinau.md\/en\/wp-json\/wp\/v2\/comments?post=2419"}],"version-history":[{"count":1,"href":"https:\/\/invest.chisinau.md\/en\/wp-json\/wp\/v2\/posts\/2419\/revisions"}],"predecessor-version":[{"id":2424,"href":"https:\/\/invest.chisinau.md\/en\/wp-json\/wp\/v2\/posts\/2419\/revisions\/2424"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/invest.chisinau.md\/en\/wp-json\/wp\/v2\/media\/2420"}],"wp:attachment":[{"href":"https:\/\/invest.chisinau.md\/en\/wp-json\/wp\/v2\/media?parent=2419"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invest.chisinau.md\/en\/wp-json\/wp\/v2\/categories?post=2419"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invest.chisinau.md\/en\/wp-json\/wp\/v2\/tags?post=2419"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}